Procurement control

SIX LANES FROM NEED TO CREDIT.

Live delivery / HD truck 2214

SITE ARRIVAL CONTROL

ETA 14 min

RECEIVING CHECKLIST

  1. 01Match truck and purchase order
  2. 02Count bundles before unload
  3. 03Photograph damage and wet material
  4. 04Record substitutions before acceptance
  5. 05Assign storage zone and protection

Required materials

BUY AGAINST THE WORK PLAN.

SKU HD-4492-BX

2-in x 4-in x 8-ft Premium KD-HT SPF Stud

$5.42$6.88
450+ available
Required
240 units
Delivery
Tomorrow / 07:00–09:00

SKU HD-0032-PX

1/2-in x 100-ft Blue PEX-B Pipe

$38.15$44.00
12 available
Required
18 rolls
Delivery
Split shipment required

SKU HD-8821-GL

Low-E tempered window package / west elevation

$9,840$10,560
Special order
Required
6 units
Delivery
Target / 28 Aug

Vendor comparison

PRICE IS NOT THE WHOLE COST.

Primary branch

Best total

Lead 2 days / Freight Included

$14,280

Regional yard

Lowest unit

Lead 5 days / Freight $625

$13,940

Direct vendor

Best warranty

Lead 8 days / Freight Included

$14,610

Long-lead control

SPECIAL ORDERS

#HD-SP-88219

Custom glazed timber windows / 6

Processing

Shop drawings approved. Production slot held.

#HD-SP-77104

Forged iron entry door

Delayed

Fabrication moved five days. Dry-in sequence needs review.

#HD-SP-66308

White oak stair package

Hold

Field measure due before release.